Flooring type product product brochures installation guidelines maintenance guidelines warranty material safety data sheet.
Esd floor mat installation.
With a grounding screw or clamp attach the end of the copper strap directly to the column.
We can custom cut and make special kits for your particular requirements.
Insert the post from underneath and apply the stud over the protruding post on the top side.
Or mount a grounding.
The initial material and installation costs are only part of the total cost of owning a static control floor.
Once anti static mats are covering the table and floor you are on your way to being in compliance with ansi esd s6 1 esd grounding methods requirements for workstations.
Conductive adhesive eliminates the need for expensive copper equipotential grounding grids of the past.
We specialize in esd worksurface mats esd table top mats esd floor mats esd anti fatigue floor mats esd floor runners esd foam mats and the accessories you would need to set up your assembly line.
Fit the anvil under the post and place the punch inside the stud and hammer the post or use an arbor press until it.
Static control is critical during electronic assembly and manufacturing.
Grounding an esd floor is straightforward and easy.
Freestyle esd plus download pdf.
Affix the grounding strap to the tile as described in paragraph one.
Esd ground cords can be used to ground both table and floor mats.
Over five years these maintenance and repair costs can be.
Grounding to an earth ground step 1.
Snaps on the corner of the mat allow you to bypass the floor sending static directly from the mat to an electrical outlet using a grounding cable.
Freestyle esd plus designer.
Esd grounding methods kit.
When choosing an esd floor factor maintenance and repair into total cost of ownership.
General grounding guidelines 1.
Punch a 5mm diameter hole at the desired location of the mat.
The esd ground must be tied directly to and at the same.
Ansi esd s20 20 requires that all conductors in an esd protected area including personnel must be grounded.
Drill a hole in the support column.